Hwy 101/6 Project Update: Rodeo on First Street

The rain has returned with a vengeance this week, and much of the concrete and sidewalk work that will need to happen over the next few weeks will be at the mercy of the weather. As you drive through the project area you are sure to notice that curb, gutter and sidewalk crews are all over the place. In addition to big leaps forward in the radial work in front of the Pioneer Museum, the work continues on Main between Second and Third, and around the bioswale on Fourth and Main.
Excavation on First St between Pacific and Main in front of the Rodeo Steakhouse is one of the most striking new developments. Please note that the Rodeo is open regular hours throughout construction, and that access is available through their side door, which is on the west side (Main Street side) of the building, set back in their parking lot. A recent lunch there reminded me that I would cross any barrier for those spicy cheesy egg rolls…
Things are also moving efficiently on the bridge work. There are some big pours scheduled through the end of this week and in to next week, which will provide the base structure for the new bridge. This is exciting for progress, but also an easy way to get distracted as you’re driving through the area. Please be mindful of the stop and start traffic through the project area and stay safe.